A reorder point is a commitment device. Itconverts a judgement about the future into a rule that fires without furtherdiscussion, which is exactly why it has to be built from evidence rather thanfrom a round number.
A reorder point is the inventory level atwhich you place the next order. Get it wrong in one direction and you stockout; wrong in the other and you carry stock you did not need. Neither error issymmetric in cost.
Reorder point equals average daily demandmultiplied by the lead time, plus safety stock. The formula is simple. Thedifficulty is that the lead time is not a number — it is a range, and the rangewidens during peak season.
Using the average lead time guarantees thatroughly half your orders arrive later than the reorder point assumed. That isnot a conservative plan.
The fix is not a bigger safety stock. It isto use the lead time distribution rather than its average, which means thereorder point covers the 90th or 95th percentile of arrivals rather than themean. The difference is often a third of the safety stock, because the tail iswhere the stockouts live.
1. Production lead time, frompurchase order to goods ready. This is the supplier's number and it is usuallythe steadiest of the three.
2. Transit lead time, from goodsready to arrival at the destination port. This is the forwarder's number and ithas the widest range.
3. Internal lead time, fromarrival to stock available for sale. This is your own number and it is the onemost often ignored — receiving, inspection, put-away, and the delay before thesystem shows the stock as sellable.
The production component has a hiddendependency: it usually starts from purchase order confirmation, not from theenquiry. A supplier who takes ten days to confirm the order has added ten daysthat no one recorded.
The production component is also the onemost exposed to the calendar. Chinese New Year, the October holiday and thesummer power restrictions all extend it, and none of them appear in asupplier's quoted lead time until the order is placed against a date thatcrosses one of them.
Component | Who owns it | Typical range | Most common error |
Production | Supplier | 30 to 60 days | Timing it from the enquiry rather than from the confirmation |
Transit | Carrier and forwarder | 14 to 40 days | Using an advertised transit instead of an arrival history |
Internal | Importer | 3 to 10 days | Not measuring it at all |
A container that arrives on Tuesday and isnot on the shelf until the following Monday has a seven-day internal lead timethat nobody wrote down. Planning against the arrival date rather than theavailability date produces recurring stockouts that look like supplierfailures.
Measure it once. For most importers it isbetween three and ten days, and it is stable enough to plan against.
The measurement is simple: take the lasttwenty container arrivals and record the days between the availability date andthe date the stock was sellable. The average is the number to use, and themaximum is the number to worry about.
Trigger | What it signals | Action |
Inventory falls to the reorder point | Normal replenishment | Place the order |
Transit variance widens | The lead time assumption is stale | Raise the reorder point before the stockout, not after |
A peak window is approaching | Capacity will tighten | Order earlier and split the order |
A supplier holiday is approaching | Production will stop | Place the order to finish before the wind-down |
Demand trend shifts | The average is wrong | Recalculate the average, then the point |
The supply calendar triggers are the onesthat prevent most stockouts. They are known months in advance and they arefrequently ignored because they are not in the system.
A sixth trigger is worth adding: a changein the sales forecast. A promotion that doubles demand for six weeks changesthe reorder point for its duration, and leaving the point unchanged converts aplanned demand increase into a stockout.
The trigger list should be reviewed whenthe supply chain changes, not only when a stockout happens. A new carrier, anew gateway or a new warehouse all invalidate the assumptions behind the point,and the invalidation is silent until the first missed order.
A reorder point set eighteen months ago isa description of a supply chain that no longer exists. Review the pointwhenever a carrier, a port, a supplier or a service level changes, and atminimum once a year.
Then review it again after the firststockout, because the cause of the stockout is the evidence that one of theinputs was wrong.
The review should record why the pointchanged. A point that moves every quarter without a recorded reason is notbeing managed; it is being adjusted until the last stockout is forgotten.