The factories close, the ports slow down,and then everything reopens at once. Planning around that sequence is ascheduling problem with a known answer, and most importers solve it by payingfor expediting instead.
The factory closure is the part everyoneknows about. The part that catches importers is the two-week wind-down beforeit and the four-week recovery after it, both of which affect cargo far morethan the holiday itself.
Period | What happens | Planning implication |
Six weeks before | Factories confirm which lines will run through the holiday | Ask now which of your SKUs can be produced |
Three weeks before | Migrant workers begin leaving; output falls | The practical production cut-off |
One week before | Trucking capacity tightens; depots close early | Last realistic gate-in |
Holiday week and after | Ports run reduced gates; some terminals close | No origin activity to rely on |
Two to four weeks after | Workforce returns gradually; output ramps | Do not plan a February shipment on a January promise |
The lunar date moves each year, fallingbetween late January and mid-February, so a plan written for last year's dateis wrong this year.
The lunar date moves each year, fallingbetween late January and mid-February. That movement is enough to invalidate aplan copied from the previous year, and it is the reason the first step isalways to confirm the date rather than to assume it.
The first is ordering too late. An orderplaced in December for delivery in March assumes a February production thatusually does not happen. The realistic production restart is the second half ofFebruary, which puts a March vessel at risk and an April arrival in prospect.
The second is ordering too much at once.Importers who compress four months of demand into a single pre-holiday ordercreate their own congestion at the origin, and then again at destination whenthe containers all arrive together.
There is a third error that is lessobvious: assuming the factory's stated capacity is available. A supplier whosays production can finish before the holiday may already have committed thatcapacity to other customers, and the promise is made before the schedule ischecked.
1. Place the pre-holiday order inOctober or early November, so production finishes before the wind-down ratherthan during it.
2. Split it into two or threesailings rather than one, so the arrival is spread across weeks and yourwarehouse is not asked to receive a month of inventory in three days.
3. Confirm in writing which linesthe factory will run during the holiday period. Some run a skeleton crew; mostdo not.
4. Book the ocean space at thesame time as the order, not after production finishes.
The fifth action is to book the inland legat the same time as the ocean leg. Pre-holiday cargo arrives in a compressedwindow at destination too, and a container that cannot get a truck appointmentin the first week of April is not much better than one that arrived late.
Every importer who ordered late placestheir order in the same two weeks of February. The result is a volume spike inMarch that fills vessels and pushes rates up, and it arrives at destination inApril when warehouse space is already committed.
If your demand genuinely requires a Marchshipment, book it in January against a space allocation rather than in Februaryagainst the spot market.
The surge has a second phase that is lessdiscussed: the return of containers. Empties accumulate at destination duringthe pre-holiday build and the return flow tightens in March, which affectsequipment availability for anyone booking in that window.
If your next shipment follows the holiday,book the equipment early. The shortage is not at origin; it is in therepositioning cycle.
The other post-holiday effect is on rates.Space that was cheap in January becomes expensive in March, because demandreturns before capacity does. Importers who book in January against a Februarysailing pay a rate that reflects the quiet period rather than the surge.
A pre-holiday build ties up cash for six toten weeks longer than a normal cycle. That cost is real and should be comparedagainst the cost of a stockout, which is usually higher but is also usuallyunderestimated.
The right answer is rarely to pre-buyeverything. It is to pre-buy the SKUs whose stockout cost is highest, and toaccept a longer lead time on the rest.
The comparison should be made explicitly. Astockout costs the lost margin plus the customer relationship; carrying cost isthe value of the goods multiplied by the cost of capital for the extra weeks.For most consumer goods the stockout is more expensive, and for slow-moving orperishable goods the reverse is true.
Doing that arithmetic per SKU, rather thanfor the catalogue as a whole, is what turns a pre-holiday build from a guessinto a decision.